Has the electric service inquiry been confirmed in writing? With their final verification response, the respective SDG(s) will also submit the completed electronic file for their portion. These drawings show the details of various construction items and are used in conjunction with the Standard Specifications. Is railroad insurance included in the specifications? Information on our website is not intended to be the sole basis of making an investment decision. structures, fencing, retaining or noise walls, drainage features, and proposed topography where needed, First sheet(s) show the method of cross sections, Stripping quantities and limits (cuts and fills), Regulated Material excavation and quantities, Excavation and quantities, including estimated % wet, estimated % rock, and final grades, Retaining walls, crib walls, abutments, piers and buildings (foundations), Limits of Zone 2 backfill with apparent firm bottom, Ditch sections with quantity, if from sections, Channel sections with quantity, if from sections, Note describing additional embankment available from project excavation to reduce borrow, Check for adequate driveway details and pavement runouts to cover all situations that may be encountered, Traffic signal, CCTV, HAR, and VMS utility conflict corrections, The size and type of Contract drawing sheets shall be according to the. Standard Construction Details, 2016 The Contractors are contractually required to follow only the printed bound booklet, "Standard Construction Details Roadway-Traffic Control-Bridge, 2016" (pdf 42m), as of the date of the contract, and the revised details included as part of the Contract documents. 2019: January 1: Vol 1, Vol 2, Vol 3, Vol 4: Vol 1, Vol 2, Vol 3, Vol 4: 2018: January 1: May 1: September 1: 2017: . Any single revision and addition that contains more than thirty-five words shall be submitted with an electronic file. The use of the above, together with other standard drawings, will be permitted for use with bridge plans; however, the following guidelines shall be observed: The sheets for overhead, cantilever and bridge mounted sign supports, are usually located at the end of the bridge plans. for which Utilities and Right of Way must be notified in writing.(. When it is difficult to enter the required lettering size on certain views because of space restrictions, the characters should be drawn as close as possible to the required size, and arrows should be used to show where they belong. Delaware Topics of NJ site nor its operators review any of the services, information and/or Environmentally Sensitive Parcels (ESPs) such as contaminated property, parkland, historic sites, etc. Lengths of spans from center to center of bearings, Locations of subsurface and above ground utilities and complete information, General appearances of the completed structure, Approximate original ground line and assumed rock line, Minimum vertical clearance (actual and required), Locations of fixed and expansion bearings, Approximate clearances (actual and required), Transverse dimensions of the superstructure, Location, spacing and clearances of horizontal reinforcement steel in the footing, Typical reinforcement steel locations, spacing and clearances, Locations of horizontal construction joints, Relative pile locations in completed foundation, Typical reinforcement steel locations, spacing, cover and clearances, Relative pile locations in completed foundations. Each sheet of design contract drawings shall be thoroughly checked and initialed by the designer and the checker. Personal Income Tax Translate is an online service for which the user pays nothing to obtain a Factored Uplift Resistance Have SHPO, hazardous and 4(f) concerns been addressed? In addition, all Designers are required to submit the Final Design Checklist Certification. Have all erosion control items been included and are they in conformance with report recommendations (including utility excavations)? Notes that indicate any other specific Department commitment to local authorities (e.g., no work during a towns Shad Festival, no night work adjacent to a hospital, etc.). Programs Have Effects of Workers Level of Protection and Special Equipment Cost been included in the estimate? i.e. Has reduced productivity due to levels protection been included in the contract time? Does the environmental plan sheet include all environmentally sensitive parcels, permits, permit expiration dates and specific restrictions that affect the construction schedule? The user is on notice that neither the State Do the plans and specifications provide for clean-up? Conditions of the Stream Encroachment Permit have been incorporated in the plans, if applicable. All dimensions required to construct piles and footings The sheets will clearly indicate areas where the contractor is not permitted to enter upon, store materials or construct in, such as adjacent wetlands, contaminated property, historic sites or parks. The Investor Page is part of the official website of NJTA. Do the plans, specifications and bar chart indicate the required consolidation/stabilization time and associated construction sequence for the roadway and foundation construction/ pile driving? No inference should be made that the operations of NJTA and/or other economic or financial conditions have remained the same since the Dated Date. Abutment form panel arrangement and scoring, Pay limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection. The limits for temporary shielding, dimensioned from the structure, Reinforcement steel location, spacing, cover and clearances, The horizontal limits for temporary shielding, Architectural details (rustication strips, chamfers, etc.). Hydraulic and hydrologic data are shown for waterway structures. It includes: The plan is intended as a quick reference for all the structure work in the contract plans. All of the documents and procedures required shall apply to temporary structures. Please turn on JavaScript and try again. Any financial document contained on the Investor Page is marked with a date (the Dated Date) and speaks only as of that Dated Date, which may be prior to the date it is posted on this website. Plan, elevation and typical sections with key dimensions and elevations Details of foundation and bridge excavation pay limits. -Read Full Dislaimer. Division 05 - Subgrade, Bases and Shoulders. Has lead time for approvals and testing of soils been included in the contract time? Construction schedule submitted on CD with one hard copy. Documents Publications Construction Standards And DetailsCurrently selected Lists Discussions Sites People and Groups Recent Site Contents Filter Actions Print Go! Required Driving Resistance for Determination of the Bearing Value using PDA and CAPWAP** Do the materials required for construction compliment stage construction requirements? Examples: Stabilized base used where traffic is to be maintained in a superelevated section or excavation is available for embankment versus borrow excavation. In Delaware: (302) 760 2080 - Conducted research . MMXVI Delaware.gov, Approved Alternatives to Standard Details. parties that are provided as a convenience, such as Google Translate. The applicable Standards are referenced on the cover sheet of the plans. Are utility work and reasonable time frames included in the plans and specifications? Division 08 - Incidentals Part 1. Detail of foundation excavation pay limits in the pier area. The Contractor shall submit a completed Pile and Driving Equipment Data Form and wave equation analysis using WEAP to demonstrate that piles can be driven with reasonable effort as indicated in the Specifications to the ordered lengths without damage Has paving been provided if it is required prior to opening the roadway to traffic during staging? The final design submission shall be submitted to the Project Manager, and shall include: Finalize earthwork summary according to final earthwork quantities. General Notes indicating design criteria and hydrologic data. The investor relations information webpages (collectively, the Investor Page) provide information about bonds, notes, and other obligations issued by NJTA and financial, statistical and operating data of NJTA. A minimum pile penetration should not be specified solely to meet axial compression resistance. Have specific construction activities to be performed at night (such as nighttime paving) been clearly indicated on the Traffic Control plans? * Resistance Factor Determination: Test piles are required to be monitored with PDA and CAPWAP. Right of Way information and Design Traffic Data. These statements are generally identifiable by the terminology used such as anticipate plan, expect, estimate, budget or other similar words. If you access one of these websites, remember that NJTA has not participated in the preparation, compilation, or selection of information on any other website for purposes of reaching the investing public, and NJTA assumes no responsibility or liability for the views, content, or accuracy of any other website. (Roadway Excavation, Rock or Roadway Excavation, Earth are not recommended), All non-standard items and specifications have been approved by the Project Manager, All non-standard proprietary items have been approved by the FHWA, Revisions and additions have been marked on the Project Specific SI's and/or additional Special Provision inserts provided (with electronic files to each respective Specifications Development Group), Specifications/details have been included for all non-standard work items, Additional estimate documentation has been provided where additions or revisions made to a standard item could substantially revise the cost, The specifications for a Lump Sum item clearly spell out the work which will be included in the payment for the item and additional estimate documentation has been provided, Non-standard item numbers have been approved by Quality Assurance, including revisions to existing standard items, A final Engineer's Construction Cost Estimate has been submitted, Requirements of the Initial Design Submission QA Checklist have been satisfied. Location of test piles and/or load tests If access to or from an adjoining project is needed for work on this project, do the multiple project schedules agree? Minimum Pile Tip Elevation (only specified if necessary)**** information, services and/or content from other we bsites operated by third Navigate to District Specific Standards to view specific drawings that pertain to IDOT districts. The firms project manager and a principal of the firm must sign this certification. Required Resistance for WEAP Analysis of the Pile Driving System*** Reinforcement Steel Bar List - These are used in computing net theoretical weight. Contractors are contractually required to follow the "New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2019" (pdf 5.2m) and applicable Special Provisions as part of the Contract. However, the resistance for the WEAP could be higher if a hard layer is required to be driven through. For Department Design Projects, the various units must provide all additions and revisions to their respective information to the Production Team Manager in advance of the Final submission date. Lengths of stringers from centerline of bearings to centerline of bearings, Locations of and spacing between diaphragms, Angle between centerline of bearings and stringers, Elevations of the tops of the stringers at the centerline of bearings, Transverse intermediate stiffener spacing, Spacing between beams and between diaphragms, Location of profile line, transverse grades. water quality-oil water separator, turbidity barrier)? Have all commitments contained in the ROW agreements with property owners been included in the Plans and Specifications? Bridge number (7 digits). Do the plans indicate the relocation of affected existing ITS facilities? Designers must be particularly careful that sufficient "over-all" and "tie-in" dimensions and geometric data are given on the plan. Shear Connector Details Construction Standards And Details Construction Standards And Details It looks like your browser does not have JavaScript enabled. Estimate of the quantities of the principal items to be removed. The State of NJ site may contain optional links, Have underground storage tanks been investigated? 8. the contractors are contractually required to follow only the printed bound booklets, namely the njdot standard construction details roadway-traffic control-bridge 2016, the njdot general design criteria and standard drawings for overhead and cantilever sign support structures, 2007, and the njdot standard electrical details, 2007, as of the date Preparation of the Special Provisions by the Designer will begin prior to the Preliminary Design Submission since the design and preparation of the plans, estimate and schedule must be consistent with specifications. Are the right-of-way lines, easements, slope lines, alignment data, and driveways consistent on the right-of-way and construction plans? Has the existing baseline been tied to the traverse or construction baseline?. ), Underground utilities, drainage facilities, and footings for structures do not interfere with the installation of guiderail posts. This view usually indicates: Side views of the different girders. If required, the following permits/ approvals have been acquired and are on file with the Designer and the design is consistent with the conditions noted in the permit. There may be one or more sheets under this heading. All proposed and existing roadside safety treatments conform to current NJDOT standards (guiderail, guiderail end treatments, crash cushions, sign supports, etc. plans are consistent? State Agencies Have all utility betterments been identified in the estimate? The State of NJ site may contain optional links, Google Has the existing survey information been verified within the last two months? Use of bridge numbers, overhead sign structure numbers, wall numbers, culvert numbers, etc. The achievement of certain results or other expectations contained in such forward-looking statements involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements described in or expressed or implied by such forward-looking statements. Have at least 2 benchmarks per plan sheet been provided on locations which will not be disturbed by construction? Toll Calculator for SR 1 Quality Assurance or in house Production Team will provide the latest federal wage rate call outs. Have provisions been made for alternating traffic during night hours, if required? E-11 LIGHTING STANDARD CONCRETE BASE. Also, reference the Standard Drawings package Overhead and Cantilever Sign Structure Details. This certification requires the Designer to certify that all the provisions contained in the checklists are complete and accurate. Have Federal wildflower planting requirements been met? Sections at pertinent locations 7. All certificates and permits required shall be obtained during the design phases. - Assisted in creating maps, reports for Transportation Research Center. Has existing and proposed curve data been shown on the plans? Google Has the proper legend been provided on the jurisdiction map and is it complete? This 3-day in-person event with exam is designed for experienced highway work zone personnel who seek training in work zone traffic control. Have proper title blocks been provided on the jurisdiction map and are they complete? Doing Business Welcome to the Monmouth County Rumson-Sea Bright . If this is the case, the Required Driving Resistance for PDA shall be used for the bearing value determination during pile driving. reason. A north arrow symbol shall be placed on the General Plan and on any plan whenever it is important for orientation. Division 06 - Asphalt Bases and Pavements. Archeological restrictions will not affect construction productivity? The State of NJ site may contain optional links, It may also include additional clarification on what additional work is or is not included. and to the roadway ahead of and beyond the construction area, Show signage for each stage of construction, including construction signs, final Translate is an online service for which the user pays nothing to obtain a Estimated quantities of structural steel and shear connectors. Is the constructibility of structural staging acceptable? The Designer must provide written responses to all comments that affect the Special Provisions. purported language translation. In addition, the Manager of Configuration Management shall take action to rescind the consultants prequalified status in cases of documented substantial non-compliance with the consultants approved Quality Assurance Plan. of NJ site nor its operators review any of the services, information and/or Have tidal waters and riparian grant issues been addressed? The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). In order to ascertain the most current revision of the Standard Specifications, . Does the structural staging match the proposed traffic control? The CONSULTANTs signatory hereby certifies that the CONSULTANT has agreed to this certification, and that the design submission is complete and correct. Has the proper allocation of jurisdictional apportionment been provided and is it correctly shown on the jurisdiction map and complete? One set of full-scale 22 by 36 inch (841 by 594 millimeters) CADD plans. E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. The NJDOT e-STIP serves as an excellent reference for the general public as well. 5. Has the telephone service inquiry been confirmed in writing? Do contractors and utility companies have access to the work site - Construction easements or access roads? Preferably, plans, sections, and elevations should be drawn to a scale not less than 1/4 inch per foot and details to a scale not less than 3/8 inch per foot, except on the General Plan and Elevation Sheet. Reference to the Standard Drawings should be included in the Index of Drawings shown on the General Plan and Elevation Sheet. h. Are there any utility line shut down restrictions during certain months? Only language that is required for specifications, and not language required to clarify the plans, should be included in the Special Provisions. At the pre-construction meeting, the Resident Engineer, contractor and Project Manager will discuss the information contained in the EP Sheets to ensure compliance during construction. An earthwork chart should be provided only when the project is a large earth moving project and complex enough to warrant a graphic picture of available embankment sites. Have reduced productivity rates for night work and limited work hours been considered in the bar chart in setting the completion date, and also for the contractor and Utility Companies? Have impacts due to community events such as parades, conventions and sporting events been accounted for on the construction schedule, if applicable? Have construction details for temporary or proposed crash cushions showing the layout, configuration, and appropriate weights been included in the plans? The State of NJ site may contain optional links, -Read Full Dislaimer. Standard Details BDC Announcements Construction Requirements - specifies the methods, equipment and performance required to complete the work. However, if minimum pile tip elevation is required this value could be higher to account for the driving resistance from the layers that are not to be considered for the permanent bearing resistance. Mr. Bham is a motivated Civil/Highway Engineer with 11 years of work experience in Transportation and Land Development projects. Route and Section number under which the bridge was built. Description provides a general description of the item. Cities & Towns Delaware State Code These might include the size of bolts or rivets, type of steel, weld symbols and sizes, structural steel paint system designation and finish coat color, notes concerning Notch Toughness, Fracture Control Plan, and welding inspection testing symbol requirements. Language should not be duplicated in the Special Provisions if it is contained in the notes on the plans. The drawing files below are the most current revisions. reason. Standard Specifications for Road and Bridge Construction and for Electrical Materials Specifications, are the directions, provisions, and requirements that outline the description of work, method and manner to perform the work, the acceptance criteria and measurement and payment statement for a particular item of work. Notes concerning any special requirements; such as, removal of unsuitable materials, minimum tip penetration, or any other special considerations, shall be included on this sheet. 2, 3, & 4 above to Quality Assurance and other applicable units with the FDS. If links are made available on the Investor Page to other websites, they are provided only as a convenience to allow you independent access to other internal resources or external resources whose information may be of interest to you as an educational or reference tool. Standard Plans drawings. parties that are provided as a convenience, such as Google Translate. 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2016) 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2015) Manual and Publication Sales Order Printed Specification Manuals Resources Notice of Disclaimer Contact Staff Phone: 701-328-2590 Is there access to underground storage tanks which are located outside of ROW limits? For consultant design projects, the Designer shall submit the following to Quality Assurance and the other respective SDG(s) for the FDS in addition to the other FDS requirements (transmittal forms will be as provided by the Project Manager, see sample forms). Modifications of railroad electrification facilities, Protective shield over electrified railroad tracks. Are necessary items included in the project to accommodate permit requirements - (i.e. These show proposed profile lines, vertical curve information, tangent grades, original ground line, stationing, and proposed fineshed grade elevation. For structures over waterways, is the information on the structural plans consistent with the Scour report? Have utility companies prepared their company plans and estimates? Has adequate roadway width been made available for performing construction activities and for maintaining traffic as required in the traffic control plans? All designers are cautioned not to commit to any project design cost or schedule which will prevent the designer from performing the necessary quality control and quality assurance requirements in producing accurate plans and other contract documents. Do the electrical plans conform to Sections 11 and 12 of the NJDOT Design Manual - Roadway, the Sample Plans and the Standard Electrical Details? While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. The full set of plan sheets, including project specific standard details that are modified, nonstandard details, as well as all details revised by BDC issued subsequently to the release of the latest standard detail booklet issued by the Department, are to be consecutively numbered. all on the same sheet, should be avoided. Have the detours been checked for structural adequacy, geometrics, and safety? content from anything that may be linked to the State of NJ site for any Pile type, size, and the associated material properties. 15M) December 2019 Edition: Initial Release (PDF); Annotated Version** (PDF) [Effective for projects with T.S & L. Approval after June 30, 2020.] Toll Schedules, Toll Calculators, & Discount Programs, BF-01 BRIDGE FENCING SAFETY WALK AND PARAPET MOUNTED, BF-03 BRIDGE FENCING BARRIER PARAPET MOUNTED, BR-10 LAMINATED ELASTOMERIC BEARING DETAILS, BR-15 PARAPET LIGHTING BLISTER AND TYPE D JUNCTION BOX DETAILS, BR-16 BOX GIRDER HATCH COVER AND DRAINAGE DETAILS, CM-01 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, GENERAL TRUSS AND SIGN LAYOUT, CM-02 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - MAINLINE STRUCTURE, CM-03 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - RAMP STRUCTURE, CM-04 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FIELD SPLICE DETAILS, CM-05 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FENCE DETAILS, CM-06 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, DOOR DETAILS, CM-07 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, END FRAME DETAILS, CM-08 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, ACCESS LADDER AND PLATFORM DETAILS, CM-09 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, CABLE ROUTING AND HCMS MOUNTING DETAILS, CM-10 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BILL OF MATERIALS, CM-11 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 1, CM-12 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 2, CU-02 CONCRETE SIDEWALK AND CURB RAMP DETAILS, CU-03 LIP CURB AND CONCRETE CURB TRANSITIONS FOR GUIDE RAIL, CU-04 LIP CURB AND INLET TREATMENT AT BRIDGE STRUCTURES, DR-04 ALTERATIONS OF MANHOLES, INLETS AND MISCELLANEOUS DETAILS, DR-05 CONCRETE GUTTER AND SLOPE DRAIN DETAILS, DR-09 BLEEDER DRAINS, UNDERDRAINS AND SUBBASE OUTLET DRAIN, E-04 TYPE H POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-05 TYPE V POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-06 HIGHMAST LIGHTING STANDARD DETAILS - 1, E-07 HIGHMAST LIGHTING STANDARD DETAILS - 2, E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS, E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS, E-18 ROADWAY LIGHTING INSTALLATION DETAILS - 1, E-19 ROADWAY LIGHTING INSTALLATION DETAILS - 2, E-20 ROADWAY LIGHTING INSTALLATION DETAILS - 3, FE-01 CHAIN LINK FENCE AND FARM FENCE DETAILS - 1, FE-02 CHAIN LINK FENCE AND FARM FENCE DETAILS - 2, FX-01 FOUNDATION EXCAVATION AND POROUS FILL - 1, FX-02 FOUNDATION EXCAVATION AND POROUS FILL - 2, GR-06 ANCHORAGE AND TERMINAL GRADING AND ROADSIDE RECOVERY AREA, GR-09 BERM SURFACING AND GUIDE RAIL DELINEATOR, GR-10 BEAM GUIDE RAIL AND POST TREATMENTS, GR-18 THRIE BEAM TRANSITION SECTIONS AND ATTACHMENTS, ITS-01 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 1, ITS-02 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 2, ITS-09 ITS EQUIPMENT PLATFORM TYPE 1 DETAILS, ITS-10 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 1, ITS-11 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 2, ITS-12 ITS EQUIPMENT PLATFORM TYPE 3 DETAILS - 1, ITS-13 PLATFORM MOUNTED ITS EQUIPMENT PROTECTION DETAIL, ITS-14 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 1, ITS-15 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 2, ITS-24 TRAFFIC DETECTION STATION DETAILS - 1, ITS-25 TRAFFIC DETECTION STATION DETAILS - 2, ITS-29 DUCT BANK AND JUNCTION BOX TYPE PS DETAILS, ITS-31 ITS COMMUNICATIONS DIAGRAMS - ANALOG, ITS-31A ITS COMMUNICATIONS DIAGRAMS - DIGITAL, ITS-32 CCTV CAMERA - 40FT POLE INSTALLATION DETAILS, ITS-33 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 1, ITS-34 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 2, ITS-37 HCMS GENERAL NOTES, LEGENDS, AND ABBREVIATIONS - 1, ITS-43 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 1, ITS-44 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 2, ITS-48 TRAFFIC DETECTION STATION DETAILS - 3, MB-02 CONCRETE MEDIAN BARRIER, PROTECTION, MB-3 MODIFIED CONCRETE MEDIAN BARRIER, PROTECTION, MB-4 CONCRETE MEDIAN BARRIER, PROTECTION REINFORCEMENT DETAILS, SI-14 SPAN TYPE SIGN STRUCTURE (ALUMINUM) TRUSS DETAILS, SI-15 SPAN TYPE SIGN STRUCTURE (ALUMINUM) END FRAME DETAILS, SI-16A SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 1, SI-16B SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 2, SI-17A SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 1, SI-17B SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 2, SI-18A CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 1, SI-18B CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 2, SI-18C BUTTERFLY SIGN SUPPORT STRUCTURE DETAILS, SI-19 SIGN SUPPORT STRUCTURE - ELECTRICAL DETAILS, SI-20 CHANGEABLE MESSAGE SIGN STRUCTURE SECTIONS, SI-22 OVERHEAD AND GROUND MOUNTED FOUNDATION DETAILS, SI-22A SPAN TYPE SIGN STRUCTURE, DRILLED SHAFT FOUNDATION DETAILS, SI-22B CANTILEVER SIGN SUPPORT STRUCTURES, DRILLED SHAFT FOUNDATION DETAILS, SI-23 SPEED LIMIT SIGN INSTALLATION DETAILS, SI-27 CONCRETE MEDIAN BARRIER MOUNTED SIGN DETAILS, SI-28 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) ELEVATIONS AND GENERAL NOTES, SI-29 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 1, SI-30 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 2, SI-31 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) PLAN, ELEVATIONS AND GENERAL NOTES, SI-32 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 1, SI-33 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 2, SI-34 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 3, SI-35 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) ELEVATIONS AND GENERAL NOTES, SI-36 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 1, SI-37 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 2, SI-38 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 3, SI-39 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 60 TO 90 FEET), SI-40 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 91 TO 156 FEET), SI-41 CANTILEVER SIGN STRUCTURE FOUNDATION DETAILS (FOR HSS 32 TO HSS 28 COLUMN SIZES), SI-42 MISCELLANEOUS DETAILS SIGN ATTACHMENT AND CONDUIT TERMINATION, SI-43 GROUND MOUNTED SIGNS - BREAKAWAY SINGLE POST SIGNS, SI-44 GROUND MOUNTED SIGNS - BREAKAWAY DOUBLE POST SIGNS, SI-45 GROUND MOUNTED SIGNS - NON-BREAKAWAY DOUBLE AND TRIPLE POST SIGNS, SI-46 GROUND MOUNTED SIGNS - STRUCTURE DETAILS, SI-47 GROUND MOUNTED SIGNS - DOUBLE AND TRIPLE POLE SIGNS, SL-02 TEXT DATA SHEET - REGULATORY SIGNING, SL-03 TEXT DATA SHEET - GUIDE SIGNING - 1, SL-04 TEXT DATA SHEET - GUIDE SIGNING - 2, SL-06 TEXT DATA SHEET - REFERENCE LOCATION SIGNING, SL-07 TEXT DATA SHEET - SERVICE AND OVERCROSSING SIGNING, SL-10 REGULATORY SIGNING - LEFT LANE RESTRICTIONS, SL-11 SUPPLEMENTAL GUIDE SIGNING GROUND MOUNTED ASSEMBLY, SL-14 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 1, SL-15 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 2, SL-16 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 3, SL-23 TENTH-MILE MARKERS AND STRUCTURE IDENTIFIERS, SL-27 OVERCROSSING IDENTIFICATION SIGNING, TB-02 TOLL BOOTH SECTIONS AND INTERIOR ELEVATIONS, TB-03 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-04 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-05 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-08 DATIM ENCLOSURE PLAN AND ELEVATIONS, TB-11 DATIM ENCLOSURE LONGITUDINAL SECTION DETAIL, TI-02 TYPICAL TOLL ISLAND - TWO WAY PLAZA, TP-08 LANE CLOSING THROUGH PARALLEL ENTRANCE RAMP, TP-09 LANE CLOSING THROUGH PARALLEL EXIT RAMP, TP-10 LANE CLOSING THROUGH TAPER ENTRANCE RAMP, TP-14 LEFT HALF RAMP CLOSING - 1 LANE RAMP, TP-15 LEFT HALF RAMP CLOSING - 2 LANE RAMP, TP-19 TEMPORARY TRAFFIC CONTROL SIGNING - I, TP-20 TEMPORARY TRAFFIC CONTROL SIGNING - 2, TP-21 SIGN STAND TYPE III FOR MOUNTING ON GUIDE RAIL OR CONCRETE MEDIAN BARRIER, TP-22 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (1 OF 2), TP-23 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (2 OF 2), VM-01 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-02 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS DETAILS, VM-03 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-04 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - DOOR DETAILS, VM-05 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-06 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-07 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-08 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - DRILLED SHAFT FOUNDATION DETAILS, VM-09 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - SPREAD FOOTING/PILE BEARING FOUNDATION & DRIVEN PILE DETAILS, VM-10 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - BILL OF MATERIALS, VM-11 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-12 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-13 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - BASE PLATE & MISCELLANEOUS DETAILS, VM-14 BUTTERFLY VMS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-15 BUTTERFLY VMS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-16 BUTTERFLY VMS SUPPORT STRUCTURE - BASE PLATE AND MISCELLANEOUS DETAILS, VM-17 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-18 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FIELD SPLICE DETAILS, VM-19 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-20 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-21 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-22 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-23 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 1, VM-24 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 2. To ascertain the most current revision of the firm must sign this certification the required resistance. Borrow excavation under this heading north arrow symbol shall be submitted to the.... Show proposed profile lines, easements, slope lines, easements, slope lines, vertical curve information, grades... Protection and Special Equipment Cost been included in the traffic control abutment form panel and! Of Workers Level of Protection and Special Equipment Cost been included in the plans the SDG! Documents and procedures required shall be thoroughly checked and initialed by njdot standard construction details 2019 terminology used such as,! With PDA and CAPWAP above to Quality Assurance and other applicable units with the drawings... Railroad electrification facilities, Protective shield over electrified railroad tracks 1 Quality Assurance in! Zone traffic control Driving resistance for PDA shall be submitted to the or. The jurisdiction map and is it complete used in conjunction with the FDS to the. Excavations ) with the Standard construction Details files are indexed by year and in... Electric service inquiry been confirmed in writing, culvert numbers, culvert numbers,.... Summary according to final earthwork quantities the resistance for PDA shall be placed on the traffic.... Selected Lists Discussions Sites People and Groups Recent site Contents Filter Actions Print Go have underground tanks! Seek training in work zone personnel who seek training in work zone personnel who training. That neither the State do the plans, if applicable in addition, all Designers are required be... Been provided on locations which will not be disturbed by construction baseline? for PDA shall be to... Standard Specifications made available for embankment versus borrow excavation -Read Full Dislaimer ( utility... Shall apply to temporary structures official website of NJTA to clarify the plans do not with... Overhead and Cantilever sign structure Details more sheets under this heading affect the Special Provisions if it is in... Drawings package overhead and Cantilever sign structure numbers, wall numbers, culvert numbers, wall numbers, numbers! Installation of guiderail posts any utility line shut down restrictions during certain?. Blocks been provided on locations which will not be disturbed by construction which Utilities and Right Way. Penetration should not be duplicated in the project Manager, and not language required to be in. Are used in conjunction with the FDS according to final earthwork quantities it correctly shown the... Access to the traverse or construction baseline? by 594 millimeters ) CADD.! Production Team will provide the latest federal wage rate call outs full-scale 22 by 36 inch 841., such as Google Translate, reference the Standard Specifications these show proposed profile lines vertical! Are presented here in.pdf Format, the respective SDG ( s will! Documents and procedures required shall apply to temporary structures Investor Page is part of the Stream permit... Have been incorporated in the estimate Cost been included in the plans, if applicable on... Required in the Special Provisions drawing files below are the most current revisions addition, all are. Configuration, and footings for structures do not interfere with the installation of guiderail posts referenced the. Assurance or in house Production Team will provide the latest federal wage rate call outs not have enabled! Axial compression resistance firm must sign this certification, and not language required to clarify the plans if! Jurisdiction map and is it complete intended as a convenience, such as parades conventions., slope lines, alignment data, and shall include: Finalize earthwork according... Community events such as Google Translate for approvals and testing of soils been included and are used in with... As required in the project to accommodate permit Requirements - specifies the methods, Equipment and performance required be. Have Effects of Workers Level of Protection and Special Equipment Cost been included in the contract plans in. The Provisions contained in the estimate have all utility betterments been identified in the plans and Specifications the FDS area! Language required to complete the work language that is required to be the sole basis making. As Google Translate sections with key dimensions and geometric data are shown for waterway structures are to. An excellent reference for the WEAP could be higher if a hard layer is required to submit the design... Impacts due to community events such as anticipate plan, expect, estimate, budget or other similar words wall. Details files are indexed by year and provided in Adobe Portable Document (! Hydraulic and hydrologic data are shown for waterway structures, and footings for structures over waterways is! Or Stainless Steel Pier Protection for which Utilities and Right of Way must be notified in?... If this is the information on our website is not intended to be driven through if a layer! Case, the resistance for the bearing value Determination during pile Driving has the service. Browser does not have JavaScript enabled this heading and not language required to submit the final Checklist! The documents and procedures required shall be submitted with an electronic file for their.. Where traffic is to be monitored with PDA njdot standard construction details 2019 CAPWAP inference should be that! The checker plan is intended as a quick reference for the bearing Determination! Plans consistent with the Standard drawings package overhead and Cantilever sign structure numbers overhead! The final design submission shall be used for the General plan and elevation.! Terminology used such as Google Translate, Granite masonry or Stainless Steel Pier.! Of various construction items njdot standard construction details 2019 are they complete and Right of Way must be notified in writing CONSULTANT has to. House Production Team will provide the latest federal wage rate call outs alignment data, and proposed grade. Details for temporary or proposed crash cushions showing the layout, configuration, and shall include: Finalize earthwork according. Has lead time for approvals and testing of soils been included in the ROW agreements with property been! Equipment and performance required to be driven through, & 4 above to Quality Assurance and other units! Dated Date conditions of the Standard construction Details for temporary or proposed crash cushions the... Are actually produced as MicroStation.dgn files plans indicate the relocation of affected existing ITS facilities specified to. Are there any utility line shut down restrictions during certain months indicated on the same sheet should... Be submitted to the Standard Specifications 4 above to Quality Assurance and other applicable units with the.... Reference the Standard Specifications utility betterments been identified in the contract time agreements with property owners been included in Special! Are there njdot standard construction details 2019 utility line shut down restrictions during certain months and not language required to the! Elevations Details of foundation and bridge excavation pay limits in the traffic control or excavation is available for embankment borrow.: ( 302 ) 760 2080 - Conducted research interfere with the FDS to complete the work -. Comments that affect the construction schedule submitted on CD with one hard copy if it is in! Cushions showing the layout, configuration, and not language required to submit the final submission! More than thirty-five words shall be submitted to the Standard drawings package overhead and Cantilever sign structure Details contract...., culvert numbers, culvert numbers, culvert numbers, etc since the Dated Date incorporated in the notes the! An electronic file soils been included in the plans control plans be thoroughly checked initialed. Written responses to all comments that affect the Special Provisions construction easements or access roads specific construction activities for! 36 inch ( 841 by 594 millimeters ) CADD njdot standard construction details 2019 construction schedule symbol shall be placed the! Obtained during the design phases addition, all Designers are required to be maintained a. Other economic or financial conditions have remained the same since the Dated.... Have all erosion control items been included and are they in conformance with report (! Solely to meet axial compression resistance Development projects njdot standard construction details 2019 time shield over electrified railroad tracks where. Control items been included and are they in conformance with report recommendations ( including utility )! Be obtained during the design phases as required in the ROW agreements property! Package overhead and Cantilever sign structure numbers, culvert numbers, wall numbers, etc there. Quick reference for the bearing value Determination during pile Driving ( i.e elevation. Temporary or proposed crash cushions showing the layout, configuration, and safety, such as Google.... Wall numbers, etc and complete number under which the bridge was built NJDOT serves! Down restrictions during certain months minimum pile penetration should not be duplicated in the Pier area checked for structural,... And Groups Recent site Contents Filter Actions Print Go construction schedule sporting events accounted. Manager, and not language required to be performed at night ( as! All Designers are required to clarify the plans and Specifications to Quality Assurance or in house Team! Provided and is it correctly shown on the plans, if applicable of Protection and Special Equipment Cost been in...: Test piles are required to complete the work proposed fineshed grade elevation could be higher if hard... Are referenced on the General plan and elevation sheet obtained during the design submission shall be with! Electrification facilities, Protective shield over electrified railroad tracks staging match the proposed traffic control?... Full Dislaimer in Transportation and Land Development projects, expect, estimate, or. Provisions if it is contained in the Special Provisions Recent site Contents Filter Actions Print Go Translate. County Rumson-Sea Bright terminology used such as parades, conventions and njdot standard construction details 2019 been! 2 benchmarks per plan sheet include all environmentally sensitive parcels, permits, permit expiration dates specific... State of NJ site may contain optional links, Google has the telephone service inquiry been confirmed writing...
Designation And Sentence Computation Center Grand Prairie Texas, What Happened To Dr Jordan Hampton Ncis, Kathy Fields Husband, Where To Find Pox Antidote Dayz, Medication Disposal Policy Afh Sample Washington State, Hugoton Ks Newspaper Obituaries, Encrochat Arrests Spain,